SHOE DEPT. ENCORE
SHOE DEPT. ENCORE is a renovation/alteration project at 20131 US-59, SUITE 2216, Humble, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2016). The project has an estimated value of $210K.
๐Project Metrics
TDLR #EABPRJB6821066Project Closed
Project has been completed and closed
SHOE DEPT. ENCORE is a Renovation/Alteration project located at 20131 US-59, SUITE 2216, Humble, TX 77338 in Humble, Texas. The project has an estimated value of $210K. GGP DEERBROOK LP is the property owner and CL HELT ARCHITECT INC. is the design firm of record. The project was registered with TDLR on July 20, 2016.
โFrequently Asked Questions
What is SHOE DEPT. ENCORE?
SHOE DEPT. ENCORE is a renovation/alteration project at 20131 US-59, SUITE 2216 in Humble, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel tenant space for retail shoe store.
Is SHOE DEPT. ENCORE open in Humble?
Construction on SHOE DEPT. ENCORE is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2016. The building is finished and very likely open.
Where is SHOE DEPT. ENCORE located?
SHOE DEPT. ENCORE is located at 20131 US-59, SUITE 2216, Humble, TX, 77338, in Harris County.
Who is the owner or developer of SHOE DEPT. ENCORE?
GGP DEERBROOK LP is the property owner/developer of record for SHOE DEPT. ENCORE, per its TDLR project registration.
Who is the architect or design firm for SHOE DEPT. ENCORE?
CL HELT ARCHITECT INC. is the design firm of record for SHOE DEPT. ENCORE, according to its TDLR filing.
How much does SHOE DEPT. ENCORE cost and how big is it?
SHOE DEPT. ENCORE has an estimated construction value of $210K, based on its TDLR filing.
๐Scope of Work
Remodel tenant space for retail shoe store.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 20, 2016
Review Complete
Inspection Complete
Closed
Oct 1, 2016