SARC 5
SARC 5 is a renovation/alteration project at 3900 N CAPITAL OF TEXAS HWY, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2017). The project has an estimated value of $6.2M.
๐Project Metrics
TDLR #EABPRJB6822634Project Closed
Project has been completed and closed
SARC 5 is a Renovation/Alteration project located at 3900 N CAPITAL OF TEXAS HWY, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $6.2M. HPI is the property owner and CARSON DESIGN ASSOCAITES is the design firm of record. The project was registered with TDLR on August 12, 2016.
โFrequently Asked Questions
What is SARC 5?
SARC 5 is a renovation/alteration project at 3900 N CAPITAL OF TEXAS HWY in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out of 2 and 1/2 levels of existing 5 story office building. Work to include new partitions, cei
Is SARC 5 open in Austin?
Construction on SARC 5 is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2017. The building is finished and very likely open.
Where is SARC 5 located?
SARC 5 is located at 3900 N CAPITAL OF TEXAS HWY, Austin, TX, 78746, in Travis County.
Who is the owner or developer of SARC 5?
HPI is the property owner/developer of record for SARC 5, per its TDLR project registration.
Who is the architect or design firm for SARC 5?
CARSON DESIGN ASSOCAITES is the design firm of record for SARC 5, according to its TDLR filing.
How much does SARC 5 cost and how big is it?
SARC 5 has an estimated construction value of $6.2M, based on its TDLR filing.
๐Scope of Work
Interior finish out of 2 and 1/2 levels of existing 5 story office building. Work to include new partitions, cei
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 12, 2016
Review Complete
Inspection Complete
Closed
Feb 1, 2017
๐Related Projects
๐คSame Owner
$175.9M total๐๏ธSame Design Firm
$198.4M total๐Related City Permits
Building permits found at or near this location
Interiors finish out for restaurant
New Construction SFR Plumbing1797 sq. ft. ETJ
Replacement of complete existing central heat and air system with or without duct work Replace existing 2-ton HVAC system with a like-for-like unit
Interiors finish out for restaurant
Interior Remodel of 2nd and 3rd floor- Elevator Lobbies for Building F