ONION CREEK KITCHEN
ONION CREEK KITCHEN is a renovation/alteration project at 2510 ONION CREEK PKWY, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2016). The project has an estimated value of $150K.
๐Project Metrics
TDLR #EABPRJB6823260Project Closed
Project has been completed and closed
ONION CREEK KITCHEN is a Renovation/Alteration project located at 2510 ONION CREEK PKWY, Austin, TX 78747 in Austin, Texas. The project has an estimated value of $150K. DOMINION GROUP, THE is the property owner and THIEL & THIEL is the design firm of record. The project was registered with TDLR on August 22, 2016.
โFrequently Asked Questions
What is ONION CREEK KITCHEN?
ONION CREEK KITCHEN is a renovation/alteration project at 2510 ONION CREEK PKWY in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Add kitchen and bar to existing member space.
Is ONION CREEK KITCHEN open in Austin?
Construction on ONION CREEK KITCHEN is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2016. The building is finished and very likely open.
Where is ONION CREEK KITCHEN located?
ONION CREEK KITCHEN is located at 2510 ONION CREEK PKWY, Austin, TX, 78747, in Travis County.
Who is the owner or developer of ONION CREEK KITCHEN?
DOMINION GROUP, THE is the property owner/developer of record for ONION CREEK KITCHEN, per its TDLR project registration.
Who is the architect or design firm for ONION CREEK KITCHEN?
THIEL & THIEL is the design firm of record for ONION CREEK KITCHEN, according to its TDLR filing.
How much does ONION CREEK KITCHEN cost and how big is it?
ONION CREEK KITCHEN has an estimated construction value of $150K, based on its TDLR filing.
๐Scope of Work
Add kitchen and bar to existing member space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 22, 2016
Review Complete
Inspection Complete
Closed
Dec 1, 2016
๐Related Projects
๐คSame Owner
$900K total๐๏ธSame Design Firm
$3.6M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
***Timed Virtual Inspection: 05/05/2026 @ 8 AM*** Replacement of complete existing central heat and air system with or without duct work
Construct new walkway of 4FT connecting from sidewalk to residence and new driveway approach of 17 FT.
Re-roof tear off existing built-up roof to lightweight insulated concrete deck (R16) and install 2.2 polyiso insulation (R12) & TPO membrane. The LWIC and Polyiso insulation will meet 2021 IECC R25 code requirement