THE NINES is a renovation/alteration project at 1305 PINE STREET, Bastrop, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2017). The project has an estimated value of $2K.
Project has been completed and closed
THE NINES is a Renovation/Alteration project located at 1305 PINE STREET, Bastrop, TX 78603 in Bastrop, Texas. The project has an estimated value of $2K. LUND, KATHLEEN is the property owner. The project was registered with TDLR on June 21, 2017.
THE NINES is a renovation/alteration project at 1305 PINE STREET in Bastrop, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: ADDED SHAMPOO SINK,GFCI OUTLET UNDER SINK 4X4 UTLY PANELTO PORCH,HANDRAIL FOR STAIRS,ILLUMINATED BATTERY VAR175
Construction on THE NINES is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2017. The building is finished and very likely open.
THE NINES is located at 1305 PINE STREET, Bastrop, TX, 78603, in Bastrop County.
LUND, KATHLEEN is the property owner/developer of record for THE NINES, per its TDLR project registration.
THE NINES has an estimated construction value of $2K, based on its TDLR filing.
ADDED SHAMPOO SINK,GFCI OUTLET UNDER SINK 4X4 UTLY PANELTO PORCH,HANDRAIL FOR STAIRS,ILLUMINATED BATTERY VAR175
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 21, 2017
Review Complete
Inspection Complete
Closed
Jun 1, 2017
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Replacing inside air handler unit and outside condenser unit. Leaving all ductwork in tact.
Tunnel under foundation to replace cast iron with SCH 40 PVC for 2 full bathrooms kitchen and washer drain line with 2 access holes one located in the front left side of the home the second will be made in the right side by the garage area. Total length of tunnel is approximately 65 feet. We will replace sewer line from the home to the city tap connection which is about 50 feet in the yard. We will also replace water line from the meter to the home and repipe water lines inside the home for 2 full batrhooms kitchen and washer box and to the water heater.
Meter and panel change out grounding gas meter Installing 2 ground rods and grounding the panel
Install 200A (AE) meter base install 200A main breaker panel
***Timed In-Person Inspection: 04/29/2026 @ 9 AM*** Replacement of an existing water heater Replace 50 Gallon Natural Gas Water Heater [Water Heater]