๐Ÿ“Review Complete๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

THE TRIPP CENTER

1517 MCLAIN ST., Taylor, TX 76574, Taylor, TX, 76574
Construction50%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB7805372
$191K
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
3y 1mo
Duration
Registered:Nov 22, 2016
Start:Feb 1, 2017
Target:Feb 1, 2020
๐Ÿ“

Review Complete

Design review complete, construction may proceed

๐Ÿ“‹Scope of Work

4,000 sf metal building to be used as a community centerfor the city of Taylor and fellowship hall for Christ F

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
November 22, 2016
Construction Start
February 1, 2017
Expected Completion
February 1, 2020

๐Ÿ”—Related Projects

๐Ÿ‘คSame Owner

$371K total

๐Ÿ›๏ธSame Design Firm

$791K total

๐Ÿ“„Related City Permits

Building permits found at or near this location

1517 KRAMER LN

Construction of new pool

ActiveBuilding PermitNewDec 2025
$1
View Details
2025-157622 BP
๐Ÿ”งPremier Pools & Spa North Austin
1517 KRAMER LN UNIT HP1

Panel for Irrigation next to meter pack fed by MC1

FinalElectrical PermitUpgradeDec 2025
View Details
2025-143064 EP
๐Ÿ”งIn Charge Electrical Services
1517 MAIER DR

Express- conduct fire remediation including: electrical framing roofing drywall flooring and insulation. Studs around back door need to be replaced. some truces need to be reinforced )not rebuilt) some drywall in master bedroom need to be replaced and some misc patches. Back door and 1 window need replaced. A couple of outlets and light fixtures need replacement

ActiveElectrical PermitRepairDec 2025
View Details
2025-145804 EP
๐Ÿ”งPOWER ENTERPRISES
1517 MAIER DR

Express- conduct fire remediation including: electrical framing roofing drywall flooring and insulation. Studs around back door need to be replaced. some truces need to be reinforced )not rebuilt) some drywall in master bedroom need to be replaced and some misc patches. Back door and 1 window need replaced. A couple of outlets and light fixtures need replacement

ActiveBuilding PermitRepairNov 2025
$1
View Details
2025-145804 BP
๐Ÿ”งTackett and Frye Remodeling, LLC
1517 KRAMER LN

Installing Water and WW Main & Services within 5 of the building

FinalPlumbing PermitPlumbing Service LineAug 2025
View Details
2024-126015 PP