THE TRIPP CENTER
๐Project Metrics
TDLR #EABPRJB7805372Review Complete
Design review complete, construction may proceed
๐Scope of Work
4,000 sf metal building to be used as a community centerfor the city of Taylor and fellowship hall for Christ F
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$371K total๐๏ธSame Design Firm
$791K total๐Related City Permits
Building permits found at or near this location
Construction of new pool
Panel for Irrigation next to meter pack fed by MC1
Express- conduct fire remediation including: electrical framing roofing drywall flooring and insulation. Studs around back door need to be replaced. some truces need to be reinforced )not rebuilt) some drywall in master bedroom need to be replaced and some misc patches. Back door and 1 window need replaced. A couple of outlets and light fixtures need replacement
Express- conduct fire remediation including: electrical framing roofing drywall flooring and insulation. Studs around back door need to be replaced. some truces need to be reinforced )not rebuilt) some drywall in master bedroom need to be replaced and some misc patches. Back door and 1 window need replaced. A couple of outlets and light fixtures need replacement
Installing Water and WW Main & Services within 5 of the building