๐Ÿ“Review Complete๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

VILLAGE ON SAN GABRIEL

650 FM 971, Georgetown, TX 78626, Georgetown, TX, 78626
Construction50%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB7805596
$500K
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
4 months
Duration
Registered:Nov 28, 2016
Start:Mar 1, 2017
Target:Jul 1, 2017
๐Ÿ“

Review Complete

Design review complete, construction may proceed

๐Ÿ“‹Scope of Work

Construction of new Amenity Center, approximately 1868 air conditioned area, 2925 total area.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
November 28, 2016
Construction Start
March 1, 2017
Expected Completion
July 1, 2017

๐Ÿ“„Related City Permits

Building permits found at or near this location

6503 LADERA NORTE

Replacement of an existing water heater replace ng water heater

ActivePlumbing PermitChange OutDec 2025
View Details
2025-158463 PP
๐Ÿ”งChristianson Plumbing
6503 WALEBRIDGE LN

RUN GAS LINE TO GENERATOR

ActivePlumbing PermitRepairDec 2025
View Details
2025-151300 PP
๐Ÿ”งExcalibur Plumbing
6500 BEAUFORD DR

Request to disconnect We plan to remove the old main electrical panel on the exterior of the house then we will install a 125 amp main breaker emergency disconnect. We will also upgrade the grounding system and install a whole house surge protector.

FinalElectrical PermitRepairDec 2025
View Details
2025-147942 EP
๐Ÿ”งElectrical Panel Xperts
6501 HARROGATE DR

Replacement of an existing water heater replace ng water heater

ActivePlumbing PermitChange OutDec 2025
View Details
2025-150910 PP
๐Ÿ”งChristianson Plumbing
6501 W WILLIAM CANNON DR BLDG F

Provide additional power for F2541. Provide and install 2-new 2pole 15a breakers in panel FP47. provide and install a 30a non-fused disconnect. Provide and install 3KVA transformer to feed wiremold along with 3-1 pole 20a breakers and 2 -10-20r receptacles.

FinalElectrical PermitUpgradeDec 2025
View Details
2025-151129 EP
๐Ÿ”งRosendin