ALEXAN SUMMIT LIBRARY - RENOVATION is a renovation/alteration project at 1424 SUMMIT AVE, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2018). The project has an estimated value of $500K.
Project has been completed and closed
ALEXAN SUMMIT LIBRARY - RENOVATION is a Renovation/Alteration project located at 1424 SUMMIT AVE, Fort Worth, TX 76102 in Fort Worth, Texas. The project has an estimated value of $500K. ALEXAN SUMMIT is the property owner and JHP ARCHITECTURE/URBAN DESIGN is the design firm of record. The project was registered with TDLR on December 21, 2016.
ALEXAN SUMMIT LIBRARY - RENOVATION is a renovation/alteration project at 1424 SUMMIT AVE in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Adaptive reuse to existing library to loft residential apartment units. No amenity spaces.
Construction on ALEXAN SUMMIT LIBRARY - RENOVATION is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2018. The building is finished and very likely open.
ALEXAN SUMMIT LIBRARY - RENOVATION is located at 1424 SUMMIT AVE, Fort Worth, TX, 76102, in Tarrant County.
ALEXAN SUMMIT is the property owner/developer of record for ALEXAN SUMMIT LIBRARY - RENOVATION, per its TDLR project registration.
JHP ARCHITECTURE/URBAN DESIGN is the design firm of record for ALEXAN SUMMIT LIBRARY - RENOVATION, according to its TDLR filing.
ALEXAN SUMMIT LIBRARY - RENOVATION has an estimated construction value of $500K, based on its TDLR filing.
Adaptive reuse to existing library to loft residential apartment units. No amenity spaces.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 21, 2016
Review Complete
Inspection Complete
Closed
Aug 1, 2018