159 S. MAIN REMODEL
159 S. MAIN REMODEL is a renovation/alteration project at 159 S. MAIN, Keller, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2017). The project has an estimated value of $133K.
๐Project Metrics
TDLR #EABPRJB7807267Project Closed
Project has been completed and closed
159 S. MAIN REMODEL is a Renovation/Alteration project located at 159 S. MAIN, Keller, TX 76248 in Keller, Texas. The project has an estimated value of $133K. RUBEN REYNOSO is the property owner and JRAF STUDIO is the design firm of record. The project was registered with TDLR on December 21, 2016.
โFrequently Asked Questions
What is 159 S. MAIN REMODEL?
159 S. MAIN REMODEL is a renovation/alteration project at 159 S. MAIN in Keller, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: White box and retail conversion to existing building. 2separate suites.
Is 159 S. MAIN REMODEL open in Keller?
Construction on 159 S. MAIN REMODEL is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2017. The building is finished and very likely open.
Where is 159 S. MAIN REMODEL located?
159 S. MAIN REMODEL is located at 159 S. MAIN, Keller, TX, 76248, in Tarrant County.
Who is the owner or developer of 159 S. MAIN REMODEL?
RUBEN REYNOSO is the property owner/developer of record for 159 S. MAIN REMODEL, per its TDLR project registration.
Who is the architect or design firm for 159 S. MAIN REMODEL?
JRAF STUDIO is the design firm of record for 159 S. MAIN REMODEL, according to its TDLR filing.
How much does 159 S. MAIN REMODEL cost and how big is it?
159 S. MAIN REMODEL has an estimated construction value of $133K, based on its TDLR filing.
๐Scope of Work
White box and retail conversion to existing building. 2separate suites.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 21, 2016
Review Complete
Inspection Complete
Closed
Feb 1, 2017