AUSTIN ARTICLE
๐Project Metrics
TDLR #EABPRJB7812424Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
Interior renovations of the existing space and new construction of a steel frame to support storefront and light
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$2.5M total๐Related City Permits
Building permits found at or near this location
Upgrade AT&T antenna and radio equipment on an existing cell phone facility on a rooftop.
ePlan: BAUS - Airport Project: Installation of a temporary hanging scaffold system to limit impacts to the existing bagging claim level of the AUS Barbara Jordan Terminal during construction.
Installation of Ramp Information Displays (RIDS) and Gate Information Displays (GIDS) for Southwest Airlines on the ramp level and holdrooms of gates 22 and 23. Exterior 2 locations 88 square feet; Interior 2 locations 18 square feet.
REPLACE DAMAGED SERVICE DISCONNECT
Interior Renovation of existing public restrooms within Austin-Bergstrom International Airport including selective demolition architectural finishes plumbing fixture replacement and associated electrical and plumbing work. No change of use area or building footprint.