HAYS HIGH SCHOOL NO. 3
๐Project Metrics
TDLR #EABPRJB7814699Review Complete
Design review complete, construction may proceed
๐Scope of Work
New 415,000 sq. ft. 3 story academic wing, 1 story athletics, fine arts and cafeteria area.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Repair gas line and perform gas test
AT&T proposes Twr SOW - Remove (6) antennas (3) B66 & B5 RRus. Relocate: (3) B30 RRUs (3) air antennas w/ radios. Install (3) air antennas w/radios (3) antennas (3) radios. Ground SOW: Remove: (2) 100A Battery disconnect Install: (2) 200A Battery Disconnect.
ATT is proposing to install on tower: (1) Mount modification per plans attached (3) Rosenberger antennas (3) Ericsson antennas (3) Ericsson radios. Ground scope of work: (4) DC rectifiers (5) DC converters (1) Battery rack (8) 190AH batteries (6) DC breakers. No change of tower height nor ground disturbance.
Replacement of an existing water heater Replace 40-gallon water heater unit in garage.
Replacement of an existing water heater Standard 38 Gal Lowboy Electric Water Heater change out. 4400 Switch Willo #Bldg 26 Austin TX 78727