LAKESIDE PRODUCE
LAKESIDE PRODUCE is a additions to existing building project at 1212 S. 28TH AVE., Edinburg, in Hidalgo County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $2.1M.
๐Project Metrics
TDLR #EABPRJB7819128Review Complete
Design review complete, construction may proceed
LAKESIDE PRODUCE is a Additions to Existing Building project located at 1212 S. 28TH AVE., Edinburg, TX 78542 in Edinburg, Texas. The project has an estimated value of $2.1M. 2606778 US HOLDINGS INC is the property owner and JMERCDESIGN is the design firm of record. The project was registered with TDLR on June 13, 2017.
โFrequently Asked Questions
What is LAKESIDE PRODUCE?
LAKESIDE PRODUCE is a additions to existing building project at 1212 S. 28TH AVE. in Edinburg, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Produce Cooler Addition to Existing Buildings
Is LAKESIDE PRODUCE open in Edinburg?
LAKESIDE PRODUCE is currently under construction in Edinburg, TX. Its current TDLR status is "Review Complete".
Where is LAKESIDE PRODUCE located?
LAKESIDE PRODUCE is located at 1212 S. 28TH AVE., Edinburg, TX, 78542, in Hidalgo County.
Who is the owner or developer of LAKESIDE PRODUCE?
2606778 US HOLDINGS INC is the property owner/developer of record for LAKESIDE PRODUCE, per its TDLR project registration.
Who is the architect or design firm for LAKESIDE PRODUCE?
JMERCDESIGN is the design firm of record for LAKESIDE PRODUCE, according to its TDLR filing.
How much does LAKESIDE PRODUCE cost and how big is it?
LAKESIDE PRODUCE has an estimated construction value of $2.1M, based on its TDLR filing.
๐Scope of Work
Produce Cooler Addition to Existing Buildings
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 13, 2017
Review Complete
Jun 13, 2017
Inspection Complete
Closed