FORCEPOINT LOBBY
FORCEPOINT LOBBY is a renovation/alteration project at 10900 STONELAKE BLVD, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2017). The project has an estimated value of $1.3M.
๐Project Metrics
TDLR #EABPRJB7821545Project Closed
Project has been completed and closed
FORCEPOINT LOBBY is a Renovation/Alteration project located at 10900 STONELAKE BLVD, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $1.3M. LINCOLN PROPERTY COMPANY is the property owner and ABEL DESIGN GROUP is the design firm of record. The project was registered with TDLR on July 20, 2017.
โFrequently Asked Questions
What is FORCEPOINT LOBBY?
FORCEPOINT LOBBY is a renovation/alteration project at 10900 STONELAKE BLVD in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of levels 1, 2,& 3 of Lobby
Is FORCEPOINT LOBBY open in Austin?
Construction on FORCEPOINT LOBBY is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2017. The building is finished and very likely open.
Where is FORCEPOINT LOBBY located?
FORCEPOINT LOBBY is located at 10900 STONELAKE BLVD, Austin, TX, 78759, in Travis County.
Who is the owner or developer of FORCEPOINT LOBBY?
LINCOLN PROPERTY COMPANY is the property owner/developer of record for FORCEPOINT LOBBY, per its TDLR project registration.
Who is the architect or design firm for FORCEPOINT LOBBY?
ABEL DESIGN GROUP is the design firm of record for FORCEPOINT LOBBY, according to its TDLR filing.
How much does FORCEPOINT LOBBY cost and how big is it?
FORCEPOINT LOBBY has an estimated construction value of $1.3M, based on its TDLR filing.
๐Scope of Work
Interior renovation of levels 1, 2,& 3 of Lobby
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 20, 2017
Review Complete
Inspection Complete
Closed
Dec 1, 2017
๐Related Projects
๐คSame Owner
$9.3M total๐Related City Permits
Building permits found at or near this location
Install Tesla EV Charger
INTERIOR FULL FINISH OUT. EXISTING DRYWALL IS GUTTED AND CEILINGS EXPOSED. INTERIOR/EXTERIOR DOOR REPLACEMENT CABINETS DRYEWALL NEW ENGINEERED STAIRWELL RELOCATE WINDOW REPLACEMENT SHOWER RECONFIGURATION POWDER BATH AND UTILITY ROOM RECONFIGURATION. LIGHTING REPLACEMENT ONLY.
Express: Foundation repair
Replacement of complete existing central heat and air system with or without duct work hvac change out
Interior remodel to existing office PR 2025 123948 / BP 2025 133362 will be withdrawn once this BP is issued as the PR above is a QT and cant be revised but it has existing inspections that need to be transferred over.