EPIC FUN BUILD OUT
EPIC FUN BUILD OUT is a renovation/alteration project at 7101 HWY 71, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2018). The project has an estimated value of $1.6M.
๐Project Metrics
TDLR #EABPRJB7822646Inspection Complete
Final inspection completed, awaiting project closure
EPIC FUN BUILD OUT is a Renovation/Alteration project located at 7101 HWY 71, Austin, TX 78735 in Austin, Texas. The project has an estimated value of $1.6M. BBCC OAK HILL L.P. is the property owner and DYNAMIC DESIGN P.C. is the design firm of record. The project was registered with TDLR on August 4, 2017.
โFrequently Asked Questions
What is EPIC FUN BUILD OUT?
EPIC FUN BUILD OUT is a renovation/alteration project at 7101 HWY 71 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to create a Family Entertainment Center
Is EPIC FUN BUILD OUT open in Austin?
Construction on EPIC FUN BUILD OUT is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2018. The building is finished and very likely open.
Where is EPIC FUN BUILD OUT located?
EPIC FUN BUILD OUT is located at 7101 HWY 71, Austin, TX, 78735, in Travis County.
Who is the owner or developer of EPIC FUN BUILD OUT?
BBCC OAK HILL L.P. is the property owner/developer of record for EPIC FUN BUILD OUT, per its TDLR project registration.
Who is the architect or design firm for EPIC FUN BUILD OUT?
DYNAMIC DESIGN P.C. is the design firm of record for EPIC FUN BUILD OUT, according to its TDLR filing.
How much does EPIC FUN BUILD OUT cost and how big is it?
EPIC FUN BUILD OUT has an estimated construction value of $1.6M, based on its TDLR filing.
๐Scope of Work
Renovation to create a Family Entertainment Center
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 4, 2017
Review Complete
Inspection Complete
Jan 1, 2018
Closed
๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Replace skylight translucent panels.
New 2 story detached Art studio/workshop with 1 Bath covered patio and 2nd floor balcony
Installing a new irrigation system
Replacement of complete existing central heat and air system with or without duct work Replace 1 York RTU with direct fit Carrier unit 7.5 ton.(replacing #3 with S:N1C7500742).