A17100028 FICO
A17100028 FICO is a renovation/alteration project at 7700 PARMER LANE Building B, Suite 150, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2018). The project has an estimated value of $1.5M.
๐Project Metrics
TDLR #EABPRJB8801245Project Closed
Project has been completed and closed
A17100028 FICO is a Renovation/Alteration project located at 7700 PARMER LANE Building B, Suite 150, Austin, TX 78729 in Austin, Texas. The project has an estimated value of $1.5M. Accesso is the property owner and CARSON DESIGN ASSOCIATES is the design firm of record. The project was registered with TDLR on September 21, 2017.
โFrequently Asked Questions
What is A17100028 FICO?
A17100028 FICO is a renovation/alteration project at 7700 PARMER LANE Building B, Suite 150 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project consists of the finish out of an existing demised tenant suite. Suite occupancy classification and
Is A17100028 FICO open in Austin?
Construction on A17100028 FICO is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2018. The building is finished and very likely open.
Where is A17100028 FICO located?
A17100028 FICO is located at 7700 PARMER LANE Building B, Suite 150, Austin, TX, 78729, in Travis County.
Who is the owner or developer of A17100028 FICO?
Accesso is the property owner/developer of record for A17100028 FICO, per its TDLR project registration.
Who is the architect or design firm for A17100028 FICO?
CARSON DESIGN ASSOCIATES is the design firm of record for A17100028 FICO, according to its TDLR filing.
How much does A17100028 FICO cost and how big is it?
A17100028 FICO has an estimated construction value of $1.5M, based on its TDLR filing.
๐Scope of Work
This project consists of the finish out of an existing demised tenant suite. Suite occupancy classification and
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 21, 2017
Review Complete
Inspection Complete
Closed
Oct 1, 2018
๐Related Projects
๐คSame Owner
$3.4M total๐Related City Permits
Building permits found at or near this location
Express: Remove and replace 21sqft of shingles and 3sqft of sheathing on the home.
7 DAY - INTERIOR REMODEL PHASE 1 CREATING UNIT 350 DEMISING WALL BREAKROOM SAF OFFICE SPACE - OVA
7 DAY - INTERIOR REMODEL PHASE 1 CREATING UNIT 350 DEMISING WALL BREAKROOM SAF OFFICE SPACE - OVA
7 DAY - INTERIOR REMODEL PHASE 1 CREATING UNIT 350 DEMISING WALL BREAKROOM SAF OFFICE SPACE - OVA
7 DAY - INTERIOR REMODEL PHASE 1 CREATING UNIT 350 DEMISING WALL BREAKROOM SAF OFFICE SPACE - OVA