BOWIE HIGH SCHOOL BID PACKAGE 4
๐Project Metrics
TDLR #EABPRJB8802607Project Closed
Project has been completed and closed
๐Scope of Work
Construction of football practice fields. No built structures. Modification to crosswalk at corner of Wolftrap
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$3.3M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
New installation of light poles for existing public education
Stand-Alone - CONDUIT ONLY PERMIT Work consists of conduit work for the new sports complex at Bowie High School. Work that is involved: CONDUIT ONLY: For Sports Lighting Scoreboards Time-Clocks Pressboxes Was granted the permission by Interim Director Keith Mars to pull a Stand Alone for CONDUIT ONLY so we are not delayed. The Conditional Site Permit was based off the Site Plan Number: SP-2024-0439CX. All other work outside of Conduit work will be installed and inspected once the building permit is submitted.
Test Gas Line for Pulled Meter
Repair and expansion of capacity at the existing central plant. Replacement of AHUs and piping to support transition to the air-cooled system for an Existing Bowie High School
Interior remodel of administrative building to include a secure entry vestibule safe side access vestibule and replace support service areas disrupted: conference and office.
๐Related Site Plans
City of Austin site plan approvals at this location