MCD EOTF (42-0201)
MCD EOTF (42-0201) is a renovation/alteration project at 1103 FM 1462, Alvin, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2019). The project has an estimated value of $100K.
๐Project Metrics
TDLR #EABPRJB8805529Project Closed
Project has been completed and closed
MCD EOTF (42-0201) is a Renovation/Alteration project located at 1103 FM 1462, Alvin, TX 77511 in Alvin, Texas. The project has an estimated value of $100K. MCDONALD'S USA is the property owner and CASTLES DESIGN GROUP P.C. is the design firm of record. The project was registered with TDLR on November 22, 2017.
โFrequently Asked Questions
What is MCD EOTF (42-0201)?
MCD EOTF (42-0201) is a renovation/alteration project at 1103 FM 1462 in Alvin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: An interior lobby remodel of an existing McDonald's Restaurant.
Is MCD EOTF (42-0201) open in Alvin?
Construction on MCD EOTF (42-0201) is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2019. The building is finished and very likely open.
Where is MCD EOTF (42-0201) located?
MCD EOTF (42-0201) is located at 1103 FM 1462, Alvin, TX, 77511, in Brazoria County.
Who is the owner or developer of MCD EOTF (42-0201)?
MCDONALD'S USA is the property owner/developer of record for MCD EOTF (42-0201), per its TDLR project registration.
Who is the architect or design firm for MCD EOTF (42-0201)?
CASTLES DESIGN GROUP P.C. is the design firm of record for MCD EOTF (42-0201), according to its TDLR filing.
How much does MCD EOTF (42-0201) cost and how big is it?
MCD EOTF (42-0201) has an estimated construction value of $100K, based on its TDLR filing.
๐Scope of Work
An interior lobby remodel of an existing McDonald's Restaurant.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 22, 2017
Review Complete
Inspection Complete
Closed
Aug 30, 2019