POINSETTIA ST
POINSETTIA ST is a new construction project at N GRIMES AND RIO GRANDE, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2018). The project has an estimated value of $108K.
๐Project Metrics
TDLR #EABPRJB8807566Project Closed
Project has been completed and closed
POINSETTIA ST is a New Construction project located at N GRIMES AND RIO GRANDE, San Antonio, TX 78210 in San Antonio, Texas. The project has an estimated value of $108K. CITY OF SAN ANTONIO is the property owner and AECOM is the design firm of record. The project was registered with TDLR on December 28, 2017.
โFrequently Asked Questions
What is POINSETTIA ST?
POINSETTIA ST is a new construction project at N GRIMES AND RIO GRANDE in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of new sidewalks, curbs, driveways approaches and ADA ramps
Is POINSETTIA ST open in San Antonio?
Construction on POINSETTIA ST is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2018. The building is finished and very likely open.
Where is POINSETTIA ST located?
POINSETTIA ST is located at N GRIMES AND RIO GRANDE, San Antonio, TX, 78210, in Bexar County.
Who is the owner or developer of POINSETTIA ST?
CITY OF SAN ANTONIO is the property owner/developer of record for POINSETTIA ST, per its TDLR project registration.
Who is the architect or design firm for POINSETTIA ST?
AECOM is the design firm of record for POINSETTIA ST, according to its TDLR filing.
How much does POINSETTIA ST cost and how big is it?
POINSETTIA ST has an estimated construction value of $108K, based on its TDLR filing.
๐Scope of Work
Construction of new sidewalks, curbs, driveways approaches and ADA ramps
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 28, 2017
Review Complete
Inspection Complete
Closed
Feb 1, 2018
๐Related Projects
๐คSame Owner
$2.44B totalProperty Owner
Design Firm
Registered Accessibility Specialist
Bexar County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Bexar County
Find General Contractors in Bexar