H&M
H&M is a renovation/alteration project at 6002 SLIDE ROAD, Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2018). The project has an estimated value of $1.4M.
๐Project Metrics
TDLR #EABPRJB8808557Inspection Complete
Final inspection completed, awaiting project closure
H&M is a Renovation/Alteration project located at 6002 SLIDE ROAD, Lubbock, TX 79414 in Lubbock, Texas. The project has an estimated value of $1.4M. MACERICH is the property owner and LDA DESIGN GROUP is the design firm of record. The project was registered with TDLR on January 17, 2018.
โFrequently Asked Questions
What is H&M?
H&M is a renovation/alteration project at 6002 SLIDE ROAD in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: build-out of existing lease space including new storefront system, new interior walls, new flooring, new drywall
Is H&M open in Lubbock?
Construction on H&M is complete โ TDLR records show the project passed its required accessibility inspection in May 2018. The building is finished and very likely open.
Where is H&M located?
H&M is located at 6002 SLIDE ROAD, Lubbock, TX, 79414, in Lubbock County.
Who is the owner or developer of H&M?
MACERICH is the property owner/developer of record for H&M, per its TDLR project registration.
Who is the architect or design firm for H&M?
LDA DESIGN GROUP is the design firm of record for H&M, according to its TDLR filing.
How much does H&M cost and how big is it?
H&M has an estimated construction value of $1.4M, based on its TDLR filing.
๐Scope of Work
build-out of existing lease space including new storefront system, new interior walls, new flooring, new drywall
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 17, 2018
Review Complete
Inspection Complete
May 1, 2018
Closed