Project has been registered with TDLR and is in pre-construction phase
BARTON SKYWAY TWO - 4TH FLOOR RESTROOMS is a Renovation/Alteration project located at 1601 S. MOPAC EXPRESSWAY C-Wing, Level 4, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $50K. BRANDYWINE REALTY TRUST is the property owner. The project was registered with TDLR on January 31, 2018.
BARTON SKYWAY TWO - 4TH FLOOR RESTROOMS is a renovation/alteration project at 1601 S. MOPAC EXPRESSWAY C-Wing, Level 4, Austin, TX 78746 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This is an existing restroom on the C-Wing of the building, to be remodeled.
BARTON SKYWAY TWO - 4TH FLOOR RESTROOMS is currently under construction in Austin, TX. Its current TDLR status is "Project Registered".
BARTON SKYWAY TWO - 4TH FLOOR RESTROOMS is located at 1601 S. MOPAC EXPRESSWAY C-Wing, Level 4, Austin, TX 78746, Austin, TX, 78746, in Travis County.
BRANDYWINE REALTY TRUST is the property owner/developer of record for BARTON SKYWAY TWO - 4TH FLOOR RESTROOMS, per its TDLR project registration.
BARTON SKYWAY TWO - 4TH FLOOR RESTROOMS has an estimated construction value of $50K, based on its TDLR filing.
This is an existing restroom on the C-Wing of the building, to be remodeled.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 31, 2018
Review Complete
Inspection Complete
Closed
Building permits found at or near this location
Temporary Austin Energy disconnect/reconnect required for service equipment work. Replace existing meter can with new meter can and install 150A listed microgrid interconnection device / service-rated transfer equipment for battery energy storage backup system. Existing service size to remain 150 Amps. Austin Energy meter removal/reinstall and temporary shutdown to be coordinated with AE Distribution Metering.
Installation of 9.57 KE SOlar PV System to roof of residence with 27.12 KWH ESS
PARTIAL DEMOLITION / ADDITION / REMODEL OF A 2-STORY WOOD FRAME HOUSE. ADDING 51.26 SF AND REMODELING 2109.82 SF. STONE & SIDING VENEER METAL ROOF FINISHED HOUSE.
Change exception from office to food outlet approved. No remodelling work is taking place.
Change exception from office to food outlet approved. No remodelling work is taking place.