MAYFIELD ROAD
MAYFIELD ROAD is a renovation/alteration project at 3450 S HIGHWAY 161 Suite #250, Grand Prairie, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $202K.
๐Project Metrics
TDLR #EABPRJB8811598Review Complete
Design review complete, construction may proceed
MAYFIELD ROAD is a Renovation/Alteration project located at 3450 S HIGHWAY 161 Suite #250, Grand Prairie, TX 75052 in Grand Prairie, Texas. The project has an estimated value of $202K. NDC HOLDINGS is the property owner. The project was registered with TDLR on March 1, 2018.
โFrequently Asked Questions
What is MAYFIELD ROAD?
MAYFIELD ROAD is a renovation/alteration project at 3450 S HIGHWAY 161 Suite #250 in Grand Prairie, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The scope of this project is a non-structural interior finish-out in an existing single floor suite for the abov
Is MAYFIELD ROAD open in Grand Prairie?
MAYFIELD ROAD is currently under construction in Grand Prairie, TX. Its current TDLR status is "Review Complete".
Where is MAYFIELD ROAD located?
MAYFIELD ROAD is located at 3450 S HIGHWAY 161 Suite #250, Grand Prairie, TX, 75052, in Dallas County.
Who is the owner or developer of MAYFIELD ROAD?
NDC HOLDINGS is the property owner/developer of record for MAYFIELD ROAD, per its TDLR project registration.
How much does MAYFIELD ROAD cost and how big is it?
MAYFIELD ROAD has an estimated construction value of $202K, based on its TDLR filing.
๐Scope of Work
The scope of this project is a non-structural interior finish-out in an existing single floor suite for the abov
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 1, 2018
Review Complete
Mar 1, 2018
Inspection Complete
Closed