SPEC SUITE LEVEL 12
SPEC SUITE LEVEL 12 is a renovation/alteration project at 16825 NORTHCHASE DR STE 1225, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2018). The project has an estimated value of $300K.
๐Project Metrics
TDLR #EABPRJB8812728Project Closed
Project has been completed and closed
SPEC SUITE LEVEL 12 is a Renovation/Alteration project located at 16825 NORTHCHASE DR STE 1225, Houston, TX 77060 in Houston, Texas. The project has an estimated value of $300K. LINCOLN PROPERTY COMPANY is the property owner and INVENTURE DESIGN is the design firm of record. The project was registered with TDLR on March 16, 2018.
โFrequently Asked Questions
What is SPEC SUITE LEVEL 12?
SPEC SUITE LEVEL 12 is a renovation/alteration project at 16825 NORTHCHASE DR STE 1225 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing space
Is SPEC SUITE LEVEL 12 open in Houston?
Construction on SPEC SUITE LEVEL 12 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2018. The building is finished and very likely open.
Where is SPEC SUITE LEVEL 12 located?
SPEC SUITE LEVEL 12 is located at 16825 NORTHCHASE DR STE 1225, Houston, TX, 77060, in Harris County.
Who is the owner or developer of SPEC SUITE LEVEL 12?
LINCOLN PROPERTY COMPANY is the property owner/developer of record for SPEC SUITE LEVEL 12, per its TDLR project registration.
Who is the architect or design firm for SPEC SUITE LEVEL 12?
INVENTURE DESIGN is the design firm of record for SPEC SUITE LEVEL 12, according to its TDLR filing.
How much does SPEC SUITE LEVEL 12 cost and how big is it?
SPEC SUITE LEVEL 12 has an estimated construction value of $300K, based on its TDLR filing.
๐Scope of Work
Renovation of existing space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 16, 2018
Review Complete
Inspection Complete
Closed
Aug 1, 2018