US 377
US 377 is a new construction project at AT IH 35E, Denton, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2020). The project has an estimated value of $770K.
๐Project Metrics
TDLR #EABPRJB8813133Inspection Complete
Final inspection completed, awaiting project closure
US 377 is a New Construction project located at AT IH 35E, Denton, TX 76201 in Denton, Texas. The project has an estimated value of $770K. TXDOT DISTRICT: DALLAS is the property owner and LOCHNER is the design firm of record. The project was registered with TDLR on March 22, 2018.
โFrequently Asked Questions
What is US 377?
US 377 is a new construction project at AT IH 35E in Denton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of sidewalks and ADA ramps, handrails, andpedestrian elements at traffic signals.
Is US 377 open in Denton?
Construction on US 377 is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2020. The building is finished and very likely open.
Where is US 377 located?
US 377 is located at AT IH 35E, Denton, TX, 76201, in Denton County.
Who is the owner or developer of US 377?
TXDOT DISTRICT: DALLAS is the property owner/developer of record for US 377, per its TDLR project registration.
Who is the architect or design firm for US 377?
LOCHNER is the design firm of record for US 377, according to its TDLR filing.
How much does US 377 cost and how big is it?
US 377 has an estimated construction value of $770K, based on its TDLR filing.
๐Scope of Work
Construction of sidewalks and ADA ramps, handrails, andpedestrian elements at traffic signals.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 22, 2018
Review Complete
Inspection Complete
Dec 1, 2020
Closed
๐Related Projects
๐คSame Owner
$37.03B total๐๏ธSame Design Firm
$14.6M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Denton County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Denton County
Find General Contractors in Denton