SPEC SUITE 410
SPEC SUITE 410 is a renovation/alteration project at 5445 LEGACY DRIVE Suite 410, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2018). The project has an estimated value of $145K.
๐Project Metrics
TDLR #EABPRJB8814032Project Closed
Project has been completed and closed
SPEC SUITE 410 is a Renovation/Alteration project located at 5445 LEGACY DRIVE Suite 410, Plano, TX 75024 in Plano, Texas. The project has an estimated value of $145K. Wds Green Oaks LP is the property owner and GO STUDIO is the design firm of record. The project was registered with TDLR on April 4, 2018.
โFrequently Asked Questions
What is SPEC SUITE 410?
SPEC SUITE 410 is a renovation/alteration project at 5445 LEGACY DRIVE Suite 410 in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing office space in mid-riseoffice building.
Is SPEC SUITE 410 open in Plano?
Construction on SPEC SUITE 410 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2018. The building is finished and very likely open.
Where is SPEC SUITE 410 located?
SPEC SUITE 410 is located at 5445 LEGACY DRIVE Suite 410, Plano, TX, 75024, in Collin County.
Who is the owner or developer of SPEC SUITE 410?
Wds Green Oaks LP is the property owner/developer of record for SPEC SUITE 410, per its TDLR project registration.
Who is the architect or design firm for SPEC SUITE 410?
GO STUDIO is the design firm of record for SPEC SUITE 410, according to its TDLR filing.
How much does SPEC SUITE 410 cost and how big is it?
SPEC SUITE 410 has an estimated construction value of $145K, based on its TDLR filing.
๐Scope of Work
Interior renovation of existing office space in mid-riseoffice building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 4, 2018
Review Complete
Inspection Complete
Closed
Jun 1, 2018