KOONSFULLER is a new construction project at 550 RESERVE STREET Suite 450, Southlake, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2018). The project has an estimated value of $600K.
๐Project Metrics
TDLR #EABPRJB8814677Project Closed
Project has been completed and closed
KOONSFULLER is a New Construction project located at 550 RESERVE STREET Suite 450, Southlake, TX 76092 in Southlake, Texas. The project has an estimated value of $600K. GRANITE PROP. INC. AS MGR OF GPI-MT LP is the property owner and ABEL DESIGN GROUP is the design firm of record. The project was registered with TDLR on April 13, 2018.
โFrequently Asked Questions
What is KOONSFULLER?
KOONSFULLER is a new construction project at 550 RESERVE STREET Suite 450 in Southlake, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior finish out of tenant space
Is KOONSFULLER open in Southlake?
Construction on KOONSFULLER is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2018. The building is finished and very likely open.
Where is KOONSFULLER located?
KOONSFULLER is located at 550 RESERVE STREET Suite 450, Southlake, TX, 76092, in Tarrant County.
Who is the owner or developer of KOONSFULLER?
GRANITE PROP. INC. AS MGR OF GPI-MT LP is the property owner/developer of record for KOONSFULLER, per its TDLR project registration.
Who is the architect or design firm for KOONSFULLER?
ABEL DESIGN GROUP is the design firm of record for KOONSFULLER, according to its TDLR filing.
How much does KOONSFULLER cost and how big is it?
KOONSFULLER has an estimated construction value of $600K, based on its TDLR filing.
๐Scope of Work
interior finish out of tenant space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 13, 2018
Review Complete
Inspection Complete
Closed
Jul 1, 2018
๐Related Projects
๐๏ธSame Design Firm
$504.3M totalProperty Owner