KELLER LAB
KELLER LAB is a renovation/alteration project at 1221 S MOPAC EXPY Ste 120, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2019). The project has an estimated value of $705K.
๐Project Metrics
TDLR #EABPRJB8815166Project Closed
Project has been completed and closed
KELLER LAB is a Renovation/Alteration project located at 1221 S MOPAC EXPY Ste 120, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $705K. BRANDYWINE REALTY TRUST is the property owner and GROUP TWO ARCHITECTURE is the design firm of record. The project was registered with TDLR on April 18, 2018.
โFrequently Asked Questions
What is KELLER LAB?
KELLER LAB is a renovation/alteration project at 1221 S MOPAC EXPY Ste 120 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of office space
Is KELLER LAB open in Austin?
Construction on KELLER LAB is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2019. The building is finished and very likely open.
Where is KELLER LAB located?
KELLER LAB is located at 1221 S MOPAC EXPY Ste 120, Austin, TX, 78746, in Travis County.
Who is the owner or developer of KELLER LAB?
BRANDYWINE REALTY TRUST is the property owner/developer of record for KELLER LAB, per its TDLR project registration.
Who is the architect or design firm for KELLER LAB?
GROUP TWO ARCHITECTURE is the design firm of record for KELLER LAB, according to its TDLR filing.
How much does KELLER LAB cost and how big is it?
KELLER LAB has an estimated construction value of $705K, based on its TDLR filing.
๐Scope of Work
Renovation of office space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 18, 2018
Review Complete
Inspection Complete
Closed
Feb 1, 2019
๐Related Projects
๐คSame Owner
$216.1M total๐๏ธSame Design Firm
$25.7M total๐Related City Permits
Building permits found at or near this location
Addition of heaters on rooftop interior work on the first floor area behind the Studio
Replacement of complete existing central heat and air system with or without duct work Installing 3.5 Ton 15 Seer Gas System in a closet.
Replacement of an existing water heater
Plumbing for New Construction of SFR in the ETJ 2003 sq ft
Replacement of complete existing central heat and air system with or without duct work Replacing like for like 3 ton condenser coil and gas furnace.