MR CARWASH REMODEL is a renovation/alteration project at 8500 RESEARCH BLVD, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $145K.
Project has been registered with TDLR and is in pre-construction phase
MR CARWASH REMODEL is a Renovation/Alteration project located at 8500 RESEARCH BLVD, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $145K. CAR WASH PARTNERS INC is the property owner and COMPASS ROSE DESIGN GROUP is the design firm of record. The project was registered with TDLR on June 1, 2018.
MR CARWASH REMODEL is a renovation/alteration project at 8500 RESEARCH BLVD in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Minor interior remodel - demo partitions new light fixtures, new flooring, relocate existing plumbing, rotate to
MR CARWASH REMODEL is currently under construction in Austin, TX. Its current TDLR status is "Project Registered".
MR CARWASH REMODEL is located at 8500 RESEARCH BLVD, Austin, TX, 78759, in Travis County.
CAR WASH PARTNERS INC is the property owner/developer of record for MR CARWASH REMODEL, per its TDLR project registration.
COMPASS ROSE DESIGN GROUP is the design firm of record for MR CARWASH REMODEL, according to its TDLR filing.
MR CARWASH REMODEL has an estimated construction value of $145K, based on its TDLR filing.
Minor interior remodel - demo partitions new light fixtures, new flooring, relocate existing plumbing, rotate to
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 1, 2018
Review Complete
Inspection Complete
Closed
Building permits found at or near this location
Plumbing Service for Tenant finishout BLDG 4 STE #300 5800 sqft etj
Irrigation install
LIFE SAFETY- Unable to use bathrooms due to broken cast iron will need to redo PVC under slab.
Add to the existing uncovered back concrete patio and make it a 15x15 covered patio with the roof tying into existing add a ceiling fan and 4 recessed lights. Hardie wrap posts/beams/ceiling/soffit
Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and 1/2 bathroom with kitchen and washer drain line. Total length of tunnel is approximately 77 feet total of 4 access holes one on the back left side of the home and the other 3 in the front of the home. We will replace main sewer line from the home to the city tap connection total length of sewer line is approximately 90 feet.