RAYTHEON
RAYTHEON is a renovation/alteration project at 10900 STONELAKE BOULEVARD Suite 100, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2019). The project has an estimated value of $736K.
๐Project Metrics
TDLR #EABPRJB8818708Project Closed
Project has been completed and closed
RAYTHEON is a Renovation/Alteration project located at 10900 STONELAKE BOULEVARD Suite 100, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $736K. LINCOLN PROPERTY COMPANY is the property owner and STG DESIGN is the design firm of record. The project was registered with TDLR on June 5, 2018.
โFrequently Asked Questions
What is RAYTHEON?
RAYTHEON is a renovation/alteration project at 10900 STONELAKE BOULEVARD Suite 100 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out of tenant space to include offices,conference room, break area, and ""SCIF"" and ""secure""
Is RAYTHEON open in Austin?
Construction on RAYTHEON is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2019. The building is finished and very likely open.
Where is RAYTHEON located?
RAYTHEON is located at 10900 STONELAKE BOULEVARD Suite 100, Austin, TX, 78759, in Travis County.
Who is the owner or developer of RAYTHEON?
LINCOLN PROPERTY COMPANY is the property owner/developer of record for RAYTHEON, per its TDLR project registration.
Who is the architect or design firm for RAYTHEON?
STG DESIGN is the design firm of record for RAYTHEON, according to its TDLR filing.
How much does RAYTHEON cost and how big is it?
RAYTHEON has an estimated construction value of $736K, based on its TDLR filing.
๐Scope of Work
Interior finish out of tenant space to include offices,conference room, break area, and ""SCIF"" and ""secure""
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 5, 2018
Review Complete
Inspection Complete
Closed
Jan 1, 2019
๐Related Projects
๐คSame Owner
$1.28B total๐Related City Permits
Building permits found at or near this location
Install Tesla EV Charger
INTERIOR FULL FINISH OUT. EXISTING DRYWALL IS GUTTED AND CEILINGS EXPOSED. INTERIOR/EXTERIOR DOOR REPLACEMENT CABINETS DRYEWALL NEW ENGINEERED STAIRWELL RELOCATE WINDOW REPLACEMENT SHOWER RECONFIGURATION POWDER BATH AND UTILITY ROOM RECONFIGURATION. LIGHTING REPLACEMENT ONLY.
Express: Foundation repair
Replacement of complete existing central heat and air system with or without duct work hvac change out
Interior remodel to existing office PR 2025 123948 / BP 2025 133362 will be withdrawn once this BP is issued as the PR above is a QT and cant be revised but it has existing inspections that need to be transferred over.