AMERICAN AIRLINES PHASE 2A REFURBISHMENT
AMERICAN AIRLINES PHASE 2A REFURBISHMENT is a renovation/alteration project at 4601 HIGHWAY 360, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.0M.
๐Project Metrics
TDLR #EABPRJB8819623Project Registered
Project has been registered with TDLR and is in pre-construction phase
AMERICAN AIRLINES PHASE 2A REFURBISHMENT is a Renovation/Alteration project located at 4601 HIGHWAY 360, Fort Worth, TX 76155 in Fort Worth, Texas. The project has an estimated value of $1.0M. AMERICAN AIRLINES is the property owner and IDGROUP, THE is the design firm of record. The project was registered with TDLR on June 15, 2018.
โFrequently Asked Questions
What is AMERICAN AIRLINES PHASE 2A REFURBISHMENT?
AMERICAN AIRLINES PHASE 2A REFURBISHMENT is a renovation/alteration project at 4601 HIGHWAY 360 in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing training space to include new equipment platform, new movable platform over slide pit, ne
Is AMERICAN AIRLINES PHASE 2A REFURBISHMENT open in Fort Worth?
AMERICAN AIRLINES PHASE 2A REFURBISHMENT is currently under construction in Fort Worth, TX. Its current TDLR status is "Project Registered".
Where is AMERICAN AIRLINES PHASE 2A REFURBISHMENT located?
AMERICAN AIRLINES PHASE 2A REFURBISHMENT is located at 4601 HIGHWAY 360, Fort Worth, TX, 76155, in Tarrant County.
Who is the owner or developer of AMERICAN AIRLINES PHASE 2A REFURBISHMENT?
AMERICAN AIRLINES is the property owner/developer of record for AMERICAN AIRLINES PHASE 2A REFURBISHMENT, per its TDLR project registration.
Who is the architect or design firm for AMERICAN AIRLINES PHASE 2A REFURBISHMENT?
IDGROUP, THE is the design firm of record for AMERICAN AIRLINES PHASE 2A REFURBISHMENT, according to its TDLR filing.
How much does AMERICAN AIRLINES PHASE 2A REFURBISHMENT cost and how big is it?
AMERICAN AIRLINES PHASE 2A REFURBISHMENT has an estimated construction value of $1.0M, based on its TDLR filing.
๐Scope of Work
Renovation of existing training space to include new equipment platform, new movable platform over slide pit, ne
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 15, 2018
Review Complete
Inspection Complete
Closed