SWRI
SWRI is a renovation/alteration project at 8501 N. MOPAC EXPRESSWAY Suite 220, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $118K.
๐Project Metrics
TDLR #EABPRJB8820023Review Complete
Design review complete, construction may proceed
SWRI is a Renovation/Alteration project located at 8501 N. MOPAC EXPRESSWAY Suite 220, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $118K. MOPAC REUNION PARK LLC is the property owner and CARSON DESIGN ASSOCIATES is the design firm of record. The project was registered with TDLR on June 21, 2018.
โFrequently Asked Questions
What is SWRI?
SWRI is a renovation/alteration project at 8501 N. MOPAC EXPRESSWAY Suite 220 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing demised tenant suite, includes the construction of four new offices and one new conferenc
Is SWRI open in Austin?
SWRI is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is SWRI located?
SWRI is located at 8501 N. MOPAC EXPRESSWAY Suite 220, Austin, TX, 78759, in Travis County.
Who is the owner or developer of SWRI?
MOPAC REUNION PARK LLC is the property owner/developer of record for SWRI, per its TDLR project registration.
Who is the architect or design firm for SWRI?
CARSON DESIGN ASSOCIATES is the design firm of record for SWRI, according to its TDLR filing.
How much does SWRI cost and how big is it?
SWRI has an estimated construction value of $118K, based on its TDLR filing.
๐Scope of Work
Renovation of existing demised tenant suite, includes the construction of four new offices and one new conferenc
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 21, 2018
Review Complete
Jun 21, 2018
Inspection Complete
Closed
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Tunnel under slab up to 23 to expose and replace broken section of main building drain line. Tunnel access will be located at backside of home at kitchen cleanout.
Interior remodel Remodel of kitchen breakfast laundry dining and living rooms new flooring in family room entry and hallways
Replacement of complete existing central heat and air system with or without duct work
Interior remodel Remodel of kitchen breakfast laundry dining and living rooms new flooring in family room entry and hallways
Interior remodel Remodel of kitchen breakfast laundry dining and living rooms new flooring in family room entry and hallways