TRACE SUBDIVISION PHASE B
๐Project Metrics
TDLR #EABPRJB8820138Review Complete
Design review complete, construction may proceed
๐Scope of Work
Public streets, sidewalks, crosswalks, and ramps.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$100K total๐Related City Permits
Building permits found at or near this location
Added some plugs and lights to a casita
Replacement of an existing water heater
Due to the age and condition of the plumbing for the drain pipes. The cast iron pipe has began to fail and needs to be replaced. The scope of work needed for this job is to insulate exposed water lines remove and replace the drain lines under the home. We will cut and remove all existing PVC and CAST IRON drain lines from underneath the home that are within the crawlspace of the home.
express existing foundation repair as per scope of work. Warranty
Replacement of complete existing central heat and air system with or without duct work