HAMMOND ST
HAMMOND ST is a new construction project at WALTERS TO ADELE, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2018). The project has an estimated value of $122K.
๐Project Metrics
TDLR #EABPRJB8820355Project Closed
Project has been completed and closed
HAMMOND ST is a New Construction project located at WALTERS TO ADELE, San Antonio, TX 78210 in San Antonio, Texas. The project has an estimated value of $122K. CITY OF SAN ANTONIO is the property owner and GKW ENGINEERING is the design firm of record. The project was registered with TDLR on June 27, 2018.
โFrequently Asked Questions
What is HAMMOND ST?
HAMMOND ST is a new construction project at WALTERS TO ADELE in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of Sidewalk, Curb Ramps and Driveways
Is HAMMOND ST open in San Antonio?
Construction on HAMMOND ST is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2018. The building is finished and very likely open.
Where is HAMMOND ST located?
HAMMOND ST is located at WALTERS TO ADELE, San Antonio, TX, 78210, in Bexar County.
Who is the owner or developer of HAMMOND ST?
CITY OF SAN ANTONIO is the property owner/developer of record for HAMMOND ST, per its TDLR project registration.
Who is the architect or design firm for HAMMOND ST?
GKW ENGINEERING is the design firm of record for HAMMOND ST, according to its TDLR filing.
How much does HAMMOND ST cost and how big is it?
HAMMOND ST has an estimated construction value of $122K, based on its TDLR filing.
๐Scope of Work
Construction of Sidewalk, Curb Ramps and Driveways
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 27, 2018
Review Complete
Inspection Complete
Closed
Jun 1, 2018
๐Related Projects
๐คSame Owner
$2.44B total๐๏ธSame Design Firm
$4.6M totalProperty Owner
Design Firm
Bexar County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Bexar County
Find General Contractors in Bexar