Construction complete ยท Nov 2018โœ…Inspection Complete๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

BICYCLE SPORT SHOP, PHASE 1 REMODEL

517 S. LAMAR BLVD., Austin, TX 78704, Austin, TX, 78704

BICYCLE SPORT SHOP, PHASE 1 REMODEL is a renovation/alteration project at 517 S. LAMAR BLVD., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2018). The project has an estimated value of $150K.

Final Inspection85%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB8820600
$150K
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
3 months
Duration
Registered:Jun 29, 2018
Start:Aug 1, 2018
Target:Nov 1, 2018
โœ…

Inspection Complete

Final inspection completed, awaiting project closure

BICYCLE SPORT SHOP, PHASE 1 REMODEL is a Renovation/Alteration project located at 517 S. LAMAR BLVD., Austin, TX 78704 in Austin, Texas. The project has an estimated value of $150K. MURPHY-GRAY PROPERTIES is the property owner and STONE SOUP 6 LLC is the design firm of record. The project was registered with TDLR on June 29, 2018.

โ“Frequently Asked Questions

What is BICYCLE SPORT SHOP, PHASE 1 REMODEL?

BICYCLE SPORT SHOP, PHASE 1 REMODEL is a renovation/alteration project at 517 S. LAMAR BLVD. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of almost 5,000 sf of 23,711 sf space.Portion to become shoe store (same tenant as bicycle sto

Is BICYCLE SPORT SHOP, PHASE 1 REMODEL open in Austin?

Construction on BICYCLE SPORT SHOP, PHASE 1 REMODEL is complete โ€” TDLR records show the project passed its required accessibility inspection in Nov 2018. The building is finished and very likely open.

Where is BICYCLE SPORT SHOP, PHASE 1 REMODEL located?

BICYCLE SPORT SHOP, PHASE 1 REMODEL is located at 517 S. LAMAR BLVD., Austin, TX, 78704, in Travis County.

Who is the owner or developer of BICYCLE SPORT SHOP, PHASE 1 REMODEL?

MURPHY-GRAY PROPERTIES is the property owner/developer of record for BICYCLE SPORT SHOP, PHASE 1 REMODEL, per its TDLR project registration.

Who is the architect or design firm for BICYCLE SPORT SHOP, PHASE 1 REMODEL?

STONE SOUP 6 LLC is the design firm of record for BICYCLE SPORT SHOP, PHASE 1 REMODEL, according to its TDLR filing.

How much does BICYCLE SPORT SHOP, PHASE 1 REMODEL cost and how big is it?

BICYCLE SPORT SHOP, PHASE 1 REMODEL has an estimated construction value of $150K, based on its TDLR filing.

๐Ÿ“‹Scope of Work

Interior remodel of almost 5,000 sf of 23,711 sf space.Portion to become shoe store (same tenant as bicycle sto

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
June 29, 2018
Inspection Complete
November 1, 2018
Construction Start
August 1, 2018
Expected Completion
November 1, 2018

๐Ÿ“…Project Timeline

Filed

Jun 29, 2018

Review Complete

Inspection Complete

Nov 1, 2018

Closed

๐Ÿ”—Related Projects

๐Ÿ“„Related City Permits

Building permits found at or near this location

517 S PLEASANT VALLEY RD

Electrical connection to existing water quality control pond pump at Krieg Field (City of Austin Parks and Recreation). Install approximately 345 linear feet of electrical conduit from an existing panel to the existing pump electrical connection point. Install one 15-amp 480-volt 1-phase circuit from existing 480-volt panel to a location near the pump controller. At the pump controller location install one rack-mounted 7kVA 480-120/240-volt transformer with service disconnects for line and load connections. Terminate new low-voltage circuit to the pump controller. Underground feeder routed in 2 Schedule 80 PVC from the 480-volt panel to the transformer with two in-ground Quazite boxes with lids. Conductor size increased based on limiting voltage drop due to length. Pump controller and alarm system provided by others and existing. Trenching provided by City of Austin Parks and Recreation.

ActiveElectrical PermitRepairJun 2026
View Details
2026-074050 EP
๐Ÿ”งJ.S. Electric, Inc.
517 TILLERY ST BLDG 1

(Warnock Connor) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP

FinalElectrical PermitSpecial Inspections ProgramApr 2026
View Details
2026-040411 EP
๐Ÿ”งSMART CHARGE RESIDENTAL LLC
517 E MARY ST

Replacement of complete existing central heat and air system with or without duct work

FinalMechanical PermitChange OutDec 2025
View Details
2025-158897 MP
๐Ÿ”งRadiant Plumbing and Air Conditioning
517 TILLERY ST BLDG 1

Bldg 1 (front building): New 2-story residence [2 bed 2.5 bath] with attached Carport. Part of 3-unit use.

FinalElectrical PermitNewApr 2025
View Details
2024-097955 EP
๐Ÿ”งAEI Electric LLC
517 TILLERY ST BLDG 2

Bldg 2 (middle building): New 2-story residence [2 bed 2.5 bath] with attached Carport. Part of 3-unit use.

FinalElectrical PermitNewApr 2025
View Details
2024-097956 EP
๐Ÿ”งAEI Electric LLC

Quick Actions

TDLR ID: EABPRJB8820600
๐Ÿ“Š

Travis County Economy

3.5%
Unemployment
$529K
Median Listing
15,059
Bldg Permits/yr
1.4M
Population
6,332
Active Listings
$97K
Median Income
Source: FRED ยท Updated May 2026
County projects โ†’

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists