AIRSWIFT
AIRSWIFT is a renovation/alteration project at 3050 POST OAK BLVD, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2019). The project has an estimated value of $550K across about 349,000 sq ft.
๐Project Metrics
TDLR #EABPRJB8820604Project Closed
Project has been completed and closed
AIRSWIFT is a Renovation/Alteration project located at 3050 POST OAK BLVD, Houston, TX 77056 in Houston, Texas. The project has an estimated value of $550K covering 349,000 sq ft. SInopec USA, Inc. is the property owner and ABEL DESIGN GROUP is the design firm of record. The project was registered with TDLR on June 29, 2018.
โFrequently Asked Questions
What is AIRSWIFT?
AIRSWIFT is a renovation/alteration project at 3050 POST OAK BLVD in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior addition to existing interior space
Is AIRSWIFT open in Houston?
Construction on AIRSWIFT is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2019. The building is finished and very likely open.
Where is AIRSWIFT located?
AIRSWIFT is located at 3050 POST OAK BLVD, Houston, TX, 77056, in Harris County.
Who is the owner or developer of AIRSWIFT?
SInopec USA, Inc. is the property owner/developer of record for AIRSWIFT, per its TDLR project registration.
Who is the architect or design firm for AIRSWIFT?
ABEL DESIGN GROUP is the design firm of record for AIRSWIFT, according to its TDLR filing.
How much does AIRSWIFT cost and how big is it?
AIRSWIFT has an estimated construction value of $550K and approximately 349,000 square feet (about $2/sqft), based on its TDLR filing.
๐Scope of Work
Interior addition to existing interior space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 29, 2018
Review Complete
Inspection Complete
Closed
Dec 31, 2019