BYPASS MOBILE
BYPASS MOBILE is a renovation/alteration project at 901 S MOPAC EXPY, SUITE 200, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2018). The project has an estimated value of $150K.
๐Project Metrics
TDLR #EABPRJB8821080Project Closed
Project has been completed and closed
BYPASS MOBILE is a Renovation/Alteration project located at 901 S MOPAC EXPY, SUITE 200, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $150K. HPITX is the property owner and URBAN FOUNDRY ARCHITECTURE is the design firm of record. The project was registered with TDLR on July 9, 2018.
โFrequently Asked Questions
What is BYPASS MOBILE?
BYPASS MOBILE is a renovation/alteration project at 901 S MOPAC EXPY, SUITE 200 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Minor Interior remodel to existing suite
Is BYPASS MOBILE open in Austin?
Construction on BYPASS MOBILE is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2018. The building is finished and very likely open.
Where is BYPASS MOBILE located?
BYPASS MOBILE is located at 901 S MOPAC EXPY, SUITE 200, Austin, TX, 78746, in Travis County.
Who is the owner or developer of BYPASS MOBILE?
HPITX is the property owner/developer of record for BYPASS MOBILE, per its TDLR project registration.
Who is the architect or design firm for BYPASS MOBILE?
URBAN FOUNDRY ARCHITECTURE is the design firm of record for BYPASS MOBILE, according to its TDLR filing.
How much does BYPASS MOBILE cost and how big is it?
BYPASS MOBILE has an estimated construction value of $150K, based on its TDLR filing.
๐Scope of Work
Minor Interior remodel to existing suite
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 9, 2018
Review Complete
Inspection Complete
Closed
Sep 1, 2018
๐Related Projects
๐คSame Owner
$3.1M total๐๏ธSame Design Firm
$449.8M total๐Related City Permits
Building permits found at or near this location
New construction in-ground pool concrete deck and associated equipment pad.
CHANGE OF USE ADM OFFICE TO MEDICAL OFFICE with interior remodel
Verizon proposed fiber installation - boring conduit from ROW to proposed fiber vault/ building entry. No backup batteries or generator proposed.
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.
Replacement of complete existing central heat and air system with or without duct work