E.ON LEVEL 14 REMODEL
E.ON LEVEL 14 REMODEL is a renovation/alteration project at 701 BRAZOS Suite 1400, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2019). The project has an estimated value of $450K.
๐Project Metrics
TDLR #EABPRJB8821744Project Closed
Project has been completed and closed
E.ON LEVEL 14 REMODEL is a Renovation/Alteration project located at 701 BRAZOS Suite 1400, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $450K. Stream is the property owner and ABEL DESIGN GROUP is the design firm of record. The project was registered with TDLR on July 17, 2018.
โFrequently Asked Questions
What is E.ON LEVEL 14 REMODEL?
E.ON LEVEL 14 REMODEL is a renovation/alteration project at 701 BRAZOS Suite 1400 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior renovation of existing space
Is E.ON LEVEL 14 REMODEL open in Austin?
Construction on E.ON LEVEL 14 REMODEL is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2019. The building is finished and very likely open.
Where is E.ON LEVEL 14 REMODEL located?
E.ON LEVEL 14 REMODEL is located at 701 BRAZOS Suite 1400, Austin, TX, 78701, in Travis County.
Who is the owner or developer of E.ON LEVEL 14 REMODEL?
Stream is the property owner/developer of record for E.ON LEVEL 14 REMODEL, per its TDLR project registration.
Who is the architect or design firm for E.ON LEVEL 14 REMODEL?
ABEL DESIGN GROUP is the design firm of record for E.ON LEVEL 14 REMODEL, according to its TDLR filing.
How much does E.ON LEVEL 14 REMODEL cost and how big is it?
E.ON LEVEL 14 REMODEL has an estimated construction value of $450K, based on its TDLR filing.
๐Scope of Work
interior renovation of existing space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 17, 2018
Review Complete
Inspection Complete
Closed
Jun 30, 2019
๐Related Projects
๐คSame Owner
$40.4M total๐๏ธSame Design Firm
$504.3M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Amelia Hundt
Construct new walkway of 5 FT connecting from sidewalk to private property. SP-2024-0188C 2026 051154 000 00 SSI
2026/07/03 | (2026/06/30) | Austin Baptist Church 4th of July Celebration July 3 2026 From 7pm-9:30 pm. All-American Carnival with food trucks and Fireworks Show.
Replacement of complete existing central heat and air system with or without duct work
tunneling to repair broken sewer lines under the slab