DE BOULLE
DE BOULLE is a renovation/alteration project at 6821 PRESTON RD, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $500K across about 6,000 sq ft.
๐Project Metrics
TDLR #EABPRJB8822695Review Complete
Design review complete, construction may proceed
DE BOULLE is a Renovation/Alteration project located at 6821 PRESTON RD, Dallas, TX 75205 in Dallas, Texas. The project has an estimated value of $500K covering 6,000 sq ft. DE BOULLE is the property owner and GENSLER is the design firm of record. The project was registered with TDLR on July 30, 2018.
โFrequently Asked Questions
What is DE BOULLE?
DE BOULLE is a renovation/alteration project at 6821 PRESTON RD in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of 4,527 SF in level 01 of an existing 2 story retail space (11,170 SF)
Is DE BOULLE open in Dallas?
DE BOULLE is currently under construction in Dallas, TX. Its current TDLR status is "Review Complete".
Where is DE BOULLE located?
DE BOULLE is located at 6821 PRESTON RD, Dallas, TX, 75205, in Dallas County.
Who is the owner or developer of DE BOULLE?
DE BOULLE is the property owner/developer of record for DE BOULLE, per its TDLR project registration.
Who is the architect or design firm for DE BOULLE?
GENSLER is the design firm of record for DE BOULLE, according to its TDLR filing.
How much does DE BOULLE cost and how big is it?
DE BOULLE has an estimated construction value of $500K and approximately 6,000 square feet (about $83/sqft), based on its TDLR filing.
๐Scope of Work
Interior renovation of 4,527 SF in level 01 of an existing 2 story retail space (11,170 SF)
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 30, 2018
Review Complete
Jul 30, 2018
Inspection Complete
Closed