HEB AUSTIN 11 (227)
HEB AUSTIN 11 (227) is a additions to existing building project at 2110 W. SLAUGHTER LANE, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2019). The project has an estimated value of $125K.
๐Project Metrics
TDLR #EABPRJB8823774Inspection Complete
Final inspection completed, awaiting project closure
HEB AUSTIN 11 (227) is a Additions to Existing Building project located at 2110 W. SLAUGHTER LANE, Austin, TX 78748 in Austin, Texas. The project has an estimated value of $125K. HEB GROCERY COMPANY is the property owner and ACUFORM ARCHITECTURE is the design firm of record. The project was registered with TDLR on August 14, 2018.
โFrequently Asked Questions
What is HEB AUSTIN 11 (227)?
HEB AUSTIN 11 (227) is a additions to existing building project at 2110 W. SLAUGHTER LANE in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Curbside Addition
Is HEB AUSTIN 11 (227) open in Austin?
Construction on HEB AUSTIN 11 (227) is complete โ TDLR records show the project passed its required accessibility inspection in May 2019. The building is finished and very likely open.
Where is HEB AUSTIN 11 (227) located?
HEB AUSTIN 11 (227) is located at 2110 W. SLAUGHTER LANE, Austin, TX, 78748, in Travis County.
Who is the owner or developer of HEB AUSTIN 11 (227)?
HEB GROCERY COMPANY is the property owner/developer of record for HEB AUSTIN 11 (227), per its TDLR project registration.
Who is the architect or design firm for HEB AUSTIN 11 (227)?
ACUFORM ARCHITECTURE is the design firm of record for HEB AUSTIN 11 (227), according to its TDLR filing.
How much does HEB AUSTIN 11 (227) cost and how big is it?
HEB AUSTIN 11 (227) has an estimated construction value of $125K, based on its TDLR filing.
๐Scope of Work
Curbside Addition
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 14, 2018
Review Complete
Inspection Complete
May 1, 2019
Closed
๐Related Projects
๐คSame Owner
$5.19B total๐Related City Permits
Building permits found at or near this location
upgrade overhead service to 200 amp. Install new Austin Energy approved single phase 200 amp meter enclosure. Install 200 amp ATS as main breaker for future generator. Install new MLO sub panel. All branch circuits to remain as existing no new loads.
Minor interior remodel for existing Medical Office.
ePlan: Residential Expedited Review - New TWO UNIT RES. Bldg 1 New construction of a 2-Story Single Family Res. [3bed 3bath]
Minor interior remodel for existing Medical Office.
Minor interior remodel for existing Medical Office.