EL PASO MEXICAN GRILL
EL PASO MEXICAN GRILL is a renovation/alteration project at 7607 FM 1960, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $80K.
๐Project Metrics
TDLR #EABPRJB8824244Project Registered
Project has been registered with TDLR and is in pre-construction phase
EL PASO MEXICAN GRILL is a Renovation/Alteration project located at 7607 FM 1960, Houston, TX 77070 in Houston, Texas. The project has an estimated value of $80K. A NAZZARO ASSOCIATES INC is the property owner and DOUG LUM ARCHITECTURE is the design firm of record. The project was registered with TDLR on August 21, 2018.
โFrequently Asked Questions
What is EL PASO MEXICAN GRILL?
EL PASO MEXICAN GRILL is a renovation/alteration project at 7607 FM 1960 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovate existing restaurant facility. Reconfigure Bararea. Build new
Is EL PASO MEXICAN GRILL open in Houston?
EL PASO MEXICAN GRILL is currently under construction in Houston, TX. Its current TDLR status is "Project Registered".
Where is EL PASO MEXICAN GRILL located?
EL PASO MEXICAN GRILL is located at 7607 FM 1960, Houston, TX, 77070, in Harris County.
Who is the owner or developer of EL PASO MEXICAN GRILL?
A NAZZARO ASSOCIATES INC is the property owner/developer of record for EL PASO MEXICAN GRILL, per its TDLR project registration.
Who is the architect or design firm for EL PASO MEXICAN GRILL?
DOUG LUM ARCHITECTURE is the design firm of record for EL PASO MEXICAN GRILL, according to its TDLR filing.
How much does EL PASO MEXICAN GRILL cost and how big is it?
EL PASO MEXICAN GRILL has an estimated construction value of $80K, based on its TDLR filing.
๐Scope of Work
Renovate existing restaurant facility. Reconfigure Bararea. Build new
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 21, 2018
Review Complete
Inspection Complete
Closed