๐ŸProject Closed๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

1408 E. 6TH ST.

1408 E. 6TH ST., Austin, TX 78702, Austin, TX, 78702
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB9800895
$1.6M
Project Value
1,000
Square Feet
$1.60K/sqft
Cost/SqFt
2y 11mo
Duration
Registered:Sep 14, 2018
Start:Dec 1, 2018
Target:Oct 1, 2021
๐Ÿ

Project Closed

Project has been completed and closed

๐Ÿ“‹Scope of Work

New two story brick buildng

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
September 14, 2018
Construction Start
December 1, 2018
Expected Completion
October 1, 2021

๐Ÿ“Location & Views

Open in MapsGet Directions|30.26373, -97.72836

๐Ÿ“„Related City Permits

Building permits found at or near this location

1402 1/2 E 6TH ST
Same location

Meter Installation for Small Cell Approved Permit # 2023-032472-000-00-SCP.

FinalElectrical PermitRepairNov 2024
View Details
2024-141380 EP
๐Ÿ”งKGI Wireless Inc.
1401 1/2 E 6TH ST
Same location

Install (1) set of reverse lit channel letters on backer panel with LED lighting

ActiveElectrical PermitWallAug 2024
View Details
2024-098668 EP
1308 E 6TH ST
161 ft away

Install 90000 grain KDC Filtration unit in liquor storage room. Job to include the following: *Repipe all water lines in liquor storage room in PEX eliminating multiple types of piping (some materials are dissimilar & react negatively with one another) *Properly insulate and secure all water piping *Install 90000 grain KDC filtration unit at main water feed to building (to filter all incoming water) *Install discharge for the KDC & route to floor drain *Install isolation valves for the KDC for unit service (or to shut water off to the interior of the building in an emergency) *Pull & reset electric water heater in same location (wooden platform in very poor condition) * Re Route T&P line from hub drain to the exterior of the building *Install a water heater pan drain & terminate at the exterior of the building (to minimize damage from a water heater leak)

ExpiredPlumbing PermitRepairNov 2024
View Details
2024-143109 PP
๐Ÿ”งHonest Air Conditionining & Plumbing
1308 E 6TH ST
161 ft away

Run line from new Porta-John to existing sewer line in PVC. Connect grey water from new unit to sanitary drain piping. Connect cold water to Porta-John Lavatory. Install cleanout at end of Sewer line behind units. Run new vent through roof for cast iron stack at right rear of main building with flashing.

ExpiredPlumbing PermitRepairSep 2024
View Details
2024-111605 PP
๐Ÿ”งHonest Air Conditionining & Plumbing
1308 E 6TH ST
161 ft away

replace existing overhead electrical service

FinalElectrical PermitUpgradeMar 2023
View Details
2023-025932 EP
๐Ÿ”งEyes of Texas Electrical

Quick Actions

TDLR ID: EABPRJB9800895

Property Owner

๐Ÿ‘ค
1408 EAST 6TH STREET
View company profile
1408 E 6TH ST LTD 5609 S CONGRESS AVE STE 210, AUSTIN, TX 78745

Design Firm

Registered Accessibility Specialist

๐Ÿ“‹
DAVID C,DEMING
RAS #129
16222 CRYSTAL HILLS DR, AUSTIN, TX 78737