MEDSPA
MEDSPA is a renovation/alteration project at 2601 LAKESIDE PARKWAY Suite 180, Flower Mound, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $150K.
๐Project Metrics
TDLR #EABPRJB9801090Review Complete
Design review complete, construction may proceed
MEDSPA is a Renovation/Alteration project located at 2601 LAKESIDE PARKWAY Suite 180, Flower Mound, TX 75022 in Flower Mound, Texas. The project has an estimated value of $150K. ELAN FLOWER MOUND PHASE II VENTURE LLC is the property owner and WALLACE JOHNSON STUDIO is the design firm of record. The project was registered with TDLR on September 18, 2018.
โFrequently Asked Questions
What is MEDSPA?
MEDSPA is a renovation/alteration project at 2601 LAKESIDE PARKWAY Suite 180 in Flower Mound, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant improvement of existing shell space. Nonload bearing interior partitions, millwork, finishes and lighting
Is MEDSPA open in Flower Mound?
MEDSPA is currently under construction in Flower Mound, TX. Its current TDLR status is "Review Complete".
Where is MEDSPA located?
MEDSPA is located at 2601 LAKESIDE PARKWAY Suite 180, Flower Mound, TX, 75022, in Denton County.
Who is the owner or developer of MEDSPA?
ELAN FLOWER MOUND PHASE II VENTURE LLC is the property owner/developer of record for MEDSPA, per its TDLR project registration.
Who is the architect or design firm for MEDSPA?
WALLACE JOHNSON STUDIO is the design firm of record for MEDSPA, according to its TDLR filing.
How much does MEDSPA cost and how big is it?
MEDSPA has an estimated construction value of $150K, based on its TDLR filing.
๐Scope of Work
Tenant improvement of existing shell space. Nonload bearing interior partitions, millwork, finishes and lighting
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 18, 2018
Review Complete
Sep 18, 2018
Inspection Complete
Closed