IH 10 CONNECT
IH 10 CONNECT is a renovation/alteration project at IH 10 CONNECT, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2022). The project has an estimated value of $94.0M.
๐Project Metrics
TDLR #EABPRJB9802230Project Closed
Project has been completed and closed
IH 10 CONNECT is a Renovation/Alteration project located at IH 10 CONNECT, El Paso, TX 79905 in El Paso, Texas. The project has an estimated value of $94.0M. TXDOT DISTRICT: EL PASO is the property owner and KENNEDY CONSULTING INC. is the design firm of record. The project was registered with TDLR on October 3, 2018.
โFrequently Asked Questions
What is IH 10 CONNECT?
IH 10 CONNECT is a renovation/alteration project at IH 10 CONNECT in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interchange improvements. New sidewalk will be added.
Is IH 10 CONNECT open in El Paso?
Construction on IH 10 CONNECT is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2022. The building is finished and very likely open.
Where is IH 10 CONNECT located?
IH 10 CONNECT is located at IH 10 CONNECT, El Paso, TX, 79905, in El Paso County.
Who is the owner or developer of IH 10 CONNECT?
TXDOT DISTRICT: EL PASO is the property owner/developer of record for IH 10 CONNECT, per its TDLR project registration.
Who is the architect or design firm for IH 10 CONNECT?
KENNEDY CONSULTING INC. is the design firm of record for IH 10 CONNECT, according to its TDLR filing.
How much does IH 10 CONNECT cost and how big is it?
IH 10 CONNECT has an estimated construction value of $94.0M, based on its TDLR filing.
๐Scope of Work
Interchange improvements. New sidewalk will be added.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 3, 2018
Review Complete
Inspection Complete
Closed
Aug 1, 2022