CVS #00019
CVS #00019 is a renovation/alteration project at 3850 FM 2920 ROAD, Spring, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2018). The project has an estimated value of $550K.
๐Project Metrics
TDLR #EABPRJB9802287Inspection Complete
Final inspection completed, awaiting project closure
CVS #00019 is a Renovation/Alteration project located at 3850 FM 2920 ROAD, Spring, TX 77388 in Spring, Texas. The project has an estimated value of $550K. FORESITE GROUP INC is the property owner and FORESITE GROUP INC. is the design firm of record. The project was registered with TDLR on October 3, 2018.
โFrequently Asked Questions
What is CVS #00019?
CVS #00019 is a renovation/alteration project at 3850 FM 2920 ROAD in Spring, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Modification to the existing site include: exterior pavement/sidewalk replacement, restriping, landscape replace
Is CVS #00019 open in Spring?
Construction on CVS #00019 is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2018. The building is finished and very likely open.
Where is CVS #00019 located?
CVS #00019 is located at 3850 FM 2920 ROAD, Spring, TX, 77388, in Harris County.
Who is the owner or developer of CVS #00019?
FORESITE GROUP INC is the property owner/developer of record for CVS #00019, per its TDLR project registration.
Who is the architect or design firm for CVS #00019?
FORESITE GROUP INC. is the design firm of record for CVS #00019, according to its TDLR filing.
How much does CVS #00019 cost and how big is it?
CVS #00019 has an estimated construction value of $550K, based on its TDLR filing.
๐Scope of Work
Modification to the existing site include: exterior pavement/sidewalk replacement, restriping, landscape replace
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 3, 2018
Review Complete
Inspection Complete
Dec 1, 2018
Closed