825 SANDY LAKE
825 SANDY LAKE is a renovation/alteration project at 825 SANDY LAKE RD. Suite #100, Coppell, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $286K.
๐Project Metrics
TDLR #EABPRJB9802768Project Registered
Project has been registered with TDLR and is in pre-construction phase
825 SANDY LAKE is a Renovation/Alteration project located at 825 SANDY LAKE RD. Suite #100, Coppell, TX 75019 in Coppell, Texas. The project has an estimated value of $286K. CLPF SANDY NORTHPOINT LLC is the property owner and P SHADE DESIGN is the design firm of record. The project was registered with TDLR on October 10, 2018.
โFrequently Asked Questions
What is 825 SANDY LAKE?
825 SANDY LAKE is a renovation/alteration project at 825 SANDY LAKE RD. Suite #100 in Coppell, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Second generation interior remodel of existing office space within warehouse building.
Is 825 SANDY LAKE open in Coppell?
825 SANDY LAKE is currently under construction in Coppell, TX. Its current TDLR status is "Project Registered".
Where is 825 SANDY LAKE located?
825 SANDY LAKE is located at 825 SANDY LAKE RD. Suite #100, Coppell, TX, 75019, in Dallas County.
Who is the owner or developer of 825 SANDY LAKE?
CLPF SANDY NORTHPOINT LLC is the property owner/developer of record for 825 SANDY LAKE, per its TDLR project registration.
Who is the architect or design firm for 825 SANDY LAKE?
P SHADE DESIGN is the design firm of record for 825 SANDY LAKE, according to its TDLR filing.
How much does 825 SANDY LAKE cost and how big is it?
825 SANDY LAKE has an estimated construction value of $286K, based on its TDLR filing.
๐Scope of Work
Second generation interior remodel of existing office space within warehouse building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 10, 2018
Review Complete
Inspection Complete
Closed