๐ŸProject Closed๐Ÿ—๏ธ New Construction๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

BRUSHY CREEK LAKE PARK - DOG PARK

3300 BRUSHY CREEK RD., Cedar Park, TX 78613, Cedar Park, TX, 78613
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB9803128
$230K
Project Value
5,000
Square Feet
$46/sqft
Cost/SqFt
2y 5mo
Duration
Registered:Oct 16, 2018
Start:Jan 1, 2019
Target:Jun 1, 2021
๐Ÿ

Project Closed

Project has been completed and closed

๐Ÿ“‹Scope of Work

construction of a new dog park within an existing publicpark. The dog park will include multiple dog run areas

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
October 16, 2018
Construction Start
January 1, 2019
Expected Completion
June 1, 2021

๐Ÿ“„Related City Permits

Building permits found at or near this location

3300 MOUNT BONNELL DR

Install new gas line for generator

ActivePlumbing PermitRepairDec 2025
View Details
2025-157643 PP
๐Ÿ”งBurls Plumbing
3300 S CONGRESS AVE

Replaced entire gas system with black iron from meter to each of the three gas fixtures Install/Replace Poly 1 to 1 ยฟ x 25 Basic Access Minimal obstructions or basic ladder access. Minimum crawl space clearance exceeds 18. Crawl space distance not to exceed 15 feet from access opening to work site. Maximum step ladder height up to 8 feet. Maximum extension ladder height up to 15 feet with a safe landing area 3300 South Congress Avenue Austin TX 78704 U

FinalPlumbing PermitRepairDec 2025
View Details
2025-158449 PP
๐Ÿ”งRadiant Plumbing & AC
3300 BIG BEND DR

New inground pool spa and concrete decking.

ActivePlumbing PermitNewNov 2025
View Details
2025-147561 PP
๐Ÿ”งNICK KIESLING DBA @ZEN
3300 KERBEY LN

Level 2 EV Charger powered by a 60amp Circuit Breaker. Run #6 THHN c.u. & #10 THHN c.u. ground through <60 feet New 3/4ยฟ EMT conduit approx. to power the Level 2 EV Charger at 48amp constant draw.

ActiveElectrical PermitRepairNov 2025
View Details
2025-143644 EP
๐Ÿ”งFaraday Electric
3300 MERRIE LYNN AVE

New 2-story accessory structure consisting of a half bathroom covered porch and uncovered wood decks on the 1st floor and an office on the 2nd floor accessed by an exterior wood staircase.

ActiveMechanical PermitNewNov 2025
View Details
2025-072711 MP
๐Ÿ”งEpic Mechanical Inc

Quick Actions

TDLR ID: EABPRJB9803128

Property Owner

๐Ÿ‘ค
CITY OF CEDAR PARK
4 projects ยท $3.0M
View all projects
KIMBERLY REESE 450 CYPRESS CREEK RD., CEDAR PARK, TX 78613

Design Firm

๐Ÿ›๏ธ
HALFF ASSOCIATES
4 projects ยท $4.0M
View all projects
BRANDON HAY 9500 AMBERGLEN BLVD., #F-125, AUSTIN, TX 78729

Registered Accessibility Specialist

๐Ÿ“‹
COOK, SPENCER
RAS #1524
2101 E 18TH ST, AUSTIN, TX 78702