THE SLATE
THE SLATE is a renovation/alteration project at 2403 FARRINGTON STREET, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2019). The project has an estimated value of $800K.
๐Project Metrics
TDLR #EABPRJB9803623Project Closed
Project has been completed and closed
THE SLATE is a Renovation/Alteration project located at 2403 FARRINGTON STREET, Dallas, TX 75207 in Dallas, Texas. The project has an estimated value of $800K. 2403 FARRINGTON LLC is the property owner and GFF ARCHITECTS is the design firm of record. The project was registered with TDLR on October 23, 2018.
โFrequently Asked Questions
What is THE SLATE?
THE SLATE is a renovation/alteration project at 2403 FARRINGTON STREET in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of an existing 11,333 SF building.
Is THE SLATE open in Dallas?
Construction on THE SLATE is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2019. The building is finished and very likely open.
Where is THE SLATE located?
THE SLATE is located at 2403 FARRINGTON STREET, Dallas, TX, 75207, in Dallas County.
Who is the owner or developer of THE SLATE?
2403 FARRINGTON LLC is the property owner/developer of record for THE SLATE, per its TDLR project registration.
Who is the architect or design firm for THE SLATE?
GFF ARCHITECTS is the design firm of record for THE SLATE, according to its TDLR filing.
How much does THE SLATE cost and how big is it?
THE SLATE has an estimated construction value of $800K, based on its TDLR filing.
๐Scope of Work
Interior renovation of an existing 11,333 SF building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 23, 2018
Review Complete
Inspection Complete
Closed
Mar 1, 2019