๐Ÿ“‹Project Registered๐Ÿ”ง Additions to Existing Building๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

JISD | HIGH SCHOOL ADDITION

1100 FM 487, Jarrell, TX 76537, Jarrell, TX, 76537
Pre-Construction15%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB9805906
$17.0M
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
8 months
Duration
Registered:Nov 27, 2018
Start:Jan 1, 2019
Target:Sep 1, 2019
๐Ÿ“‹

Project Registered

Project has been registered with TDLR and is in pre-construction phase

๐Ÿ“‹Scope of Work

Renovations and addition at Jarrell High School for Jarrell ISD.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
November 27, 2018
Construction Start
January 1, 2019
Expected Completion
September 1, 2019

๐Ÿ“Location & Views

Open in MapsGet Directions|30.81567, -97.62481

๐Ÿ“„Related City Permits

Building permits found at or near this location

11008 ROY BUTLER DR
22.88 mi away

Express: Replacing 7 windows (like for like)

ActiveBuilding PermitRepairFeb 2026
$1
View Details
2026-003722 BP
๐Ÿ”งRenewal by Andersen
11000 MIDDLE FISKVILLE RD BLDG B
30.69 mi away

Replace 2 Regulators and perform a Gas Pressure Test.

ActivePlumbing PermitRepairFeb 2026
View Details
2026-014974 PP
๐Ÿ”งClarke Kent Plumbing, Inc.
1100 S LAMAR BLVD
39.55 mi away

Mendocino Farms Install Internal illuminated channel letter

ActiveElectrical PermitAwningFeb 2026
View Details
2026-016347 EP
1100 S LAMAR BLVD
39.55 mi away

Mendocino Farms 1.2 South Elevation internal illuminated channel letters

ActiveElectrical PermitAwningFeb 2026
View Details
2026-016360 EP
11001 CAP STONE DR
46.02 mi away

Re-route three romex wires and an outlet in a 53 long section of nonstructural interior wall that is being moved 5 inches. A 42(H) x 54(W) section of sheetrock will be removed exposing the entire lengths of the wires that need rerouting. The existing wall is a 42 high nonstructural half-height wall made of two 2x4 frames parallel to one another and separated by approximately one inch of space (13.5 thick overall including sheetrock). The intent of the project is to remove the outer 2x4 frame reducing the thickness of the wall to only one 2x4 structure. The wires are routed through the outer frame so they need to be re-routed through the inner frame.

ActiveElectrical PermitRepairFeb 2026
View Details
2026-010937 EP

Get alerts for Williamson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists