Barbra Jordan Terminal Expansion - Phase 1
๐Project Metrics
TDLR #TABS2019001477Project Closed
Project has been completed and closed
๐Scope of Work
Installation on an artwork designed by Artist Janet Zweig. The installation includes architectural finishes, furniture components and Audio/Visual Equipment
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
ePlan: BAUS - Airport Project: Installation of a temporary hanging scaffold system to limit impacts to the existing bagging claim level of the AUS Barbara Jordan Terminal during construction.
Installation of Ramp Information Displays (RIDS) and Gate Information Displays (GIDS) for Southwest Airlines on the ramp level and holdrooms of gates 22 and 23. Exterior 2 locations 88 square feet; Interior 2 locations 18 square feet.
Interior Renovation of existing public restrooms within Austin-Bergstrom International Airport including selective demolition architectural finishes plumbing fixture replacement and associated electrical and plumbing work. No change of use area or building footprint.
Installation of fourteen (14) 40x8 intermodal shipping containers 12 of which will be connected via pre-engineered pre-manufactured roof systems (3 roof systems connecting 4 containers each 2 free standing containers) PuPR2
ePlan: BAUS - Airport Project: 2D and 3D Art Installation Inside and Extending out of the Three Skylights over the Atrium Infill Area. The Artwork will Include Sculptural Bird Sculptural Floral Soundwaves and Mural Components (7000 SF).
๐Related Site Plans
City of Austin site plan approvals at this location