Kissing Tree Fitness Center is a new construction project at 201 Kissing Tree Lane, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2020). The project has an estimated value of $3.2M across about 12,000 sq ft.
Project has been completed and closed
Kissing Tree Fitness Center is a New Construction project located at 201 Kissing Tree Lane, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $3.2M covering 12,000 sq ft. Carma Paso Robles LLC is the property owner and Marsh and Associates Inc is the design firm of record. The project was registered with TDLR on January 16, 2019.
Kissing Tree Fitness Center is a new construction project at 201 Kissing Tree Lane in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Fitness Center with 2 levels for Exercise, Elevator, toilets, locker Rooms and 1 Office
Construction on Kissing Tree Fitness Center is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2020. The building is finished and very likely open.
Kissing Tree Fitness Center is located at 201 Kissing Tree Lane, San Marcos, TX, 78666, in Hays County.
Carma Paso Robles LLC is the property owner/developer of record for Kissing Tree Fitness Center, per its TDLR project registration.
Marsh and Associates Inc is the design firm of record for Kissing Tree Fitness Center, according to its TDLR filing.
Kissing Tree Fitness Center has an estimated construction value of $3.2M and approximately 12,000 square feet (about $267/sqft), based on its TDLR filing.
New Fitness Center with 2 levels for Exercise, Elevator, toilets, locker Rooms and 1 Office
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 16, 2019
Review Complete
Inspection Complete
Closed
Mar 30, 2020
Building permits found at or near this location
Tunnel under the foundation to repair a break in the PVC drain line in the master bathroom and hall bathroom with SCH 40 PVC. There will be two access holds in front of and behind the house.
Remove existing pool and replace with a new pool with the same specifications.
Partially enclosing the front porch area to add to the living room remodeling throughout of floors bathrooms closets and kitchen reinsulating the exterior walls and siding replacement. No change to impervious cover
Bldg 1 Pool (176sf)
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2.5 Ton AC System
Need a contractor for this project?
Browse verified general contractors active in Hays County
Find General Contractors in Hays