YMCA Camp Moody
๐Project Metrics
TDLR #TABS2019003339Project Closed
Project has been completed and closed
๐Scope of Work
This is an open-air, 2400sf restroom and shower facility on a concrete slab with CMU and wood finish walls. The structure is HSS columns supporting a metal and wood frame metal roof.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$1.0M total๐Related City Permits
Building permits found at or near this location
11 tunnel to expose broken pvc 90 and wye
Pool - Installation of an in-ground pool with a new concrete deck spa water pool & spa coping and equipment pad.
Pool - Installation of an in-ground pool with a new concrete deck spa water pool & spa coping and equipment pad.
Replacement of complete existing central heat and air system with or without duct work 1 system: 3 ton and 4 ton YORK side discharge Heat pumps.
Replacement of complete existing central heat and air system with or without duct work holcom