Harry C. Hanszen College Makeup Air Renovation is a renovation/alteration project at 6100 Main St, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2019). The project has an estimated value of $293K across about 4,151 sq ft.
Project has been completed and closed
Harry C. Hanszen College Makeup Air Renovation is a Renovation/Alteration project located at 6100 Main St,, Houston, TX 77005 in Houston, Texas. The project has an estimated value of $293K covering 4,151 sq ft. Rice University is the property owner and Stern and Bucek Architects is the design firm of record. The project was registered with TDLR on February 22, 2019.
Harry C. Hanszen College Makeup Air Renovation is a renovation/alteration project at 6100 Main St in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Providing Makeup Air into the Existing Corridors of Hanszen College Student Housing.
Construction on Harry C. Hanszen College Makeup Air Renovation is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2019. The building is finished and very likely open.
Harry C. Hanszen College Makeup Air Renovation is located at 6100 Main St, Houston, TX, 77005, in Harris County.
Rice University is the property owner/developer of record for Harry C. Hanszen College Makeup Air Renovation, per its TDLR project registration.
Stern and Bucek Architects is the design firm of record for Harry C. Hanszen College Makeup Air Renovation, according to its TDLR filing.
Harry C. Hanszen College Makeup Air Renovation has an estimated construction value of $293K and approximately 4,151 square feet (about $71/sqft), based on its TDLR filing.
Providing Makeup Air into the Existing Corridors of Hanszen College Student Housing.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Feb 22, 2019
Review Complete
Inspection Complete
Closed
Aug 1, 2019